| |
|
|
|
| |
Phase
IV-Applicant Questionnaire-System
Data Point
and Meter Testing
The
intention of this questionnaire
is to expose the Applicant to
the standards
and requirements in the NERC Operating
Policies that apply to Control
Areas.
It also becomes the foundational
document that the review team
will use in
evaluating the Applicants preparedness
to become a Control Area. Space
is
provided after each of the following
Requirements and Standards for
a
description of how the proposed
control area meets or plans to
meet the
Requirement or Standard. Please
provide a response in each space.
The
preferred method is to enter the
response directly on an electronic
copy of
the checklist. If the Requirement
does not apply to the proposed
CONTROL
AREA (e.g., no jointly owned generation
or not a reserve sharing group
member),
simply state that fact. Where
appropriate, references are listed
immediately
following a major heading. Further
information on each of these topics
may
be found in the NERC Operating
Manual.
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
Questions?
Call us at 407-293-8870, use our
customer
service form or e-mail
customercontact@energygrp.com.
|
|
|

|
|
Reduce
Costs
Manage
Budgets
Improve
Energy Reliability
Mitigate
Price Risk
Improve
Facility Infrastructure
OutSource
Non-Core Functions
Comply
with Regulations
Click
here to see our Brochure |
|