Phase IV-Applicant Questionnaire-System Data Point
and Meter Testing

      

The intention of this questionnaire is to expose the Applicant to the standards
and requirements in the NERC Operating Policies that apply to Control Areas.
It also becomes the foundational document that the review team will use in
evaluating the Applicants preparedness to become a Control Area. Space is
provided after each of the following Requirements and Standards for a
description of how the proposed control area meets or plans to meet the
Requirement or Standard. Please provide a response in each space. The
preferred method is to enter the response directly on an electronic copy of
the checklist. If the Requirement does not apply to the proposed CONTROL
AREA (e.g., no jointly owned generation or not a reserve sharing group member),
simply state that fact. Where appropriate, references are listed immediately
following a major heading. Further information on each of these topics may
be found in the NERC Operating Manual.


 
       
       
       
       
       
  Questions?

Call us at 407-293-8870, use our customer service form or e-mail
customercontact@energygrp.com.
   

 

Reduce Costs
Manage Budgets
Improve Energy Reliability
Mitigate Price Risk
Improve Facility Infrastructure
OutSource Non-Core Functions
Comply with Regulations


Click here to see our Brochure

 
                   
          Copyright © 2006. The Energy Group of America, Inc.